A 10,000 m² factory floor in Dongguan with tooling, molding, stamping, CNC and inspection under one quality system — 280 people, injection molding from 30 to 260 T and 21 high-speed stamping presses running every day.

Wire EDM machine cutting electrode and tool steel

Tooling & EDM

Mold design and steel cutting coordinated through an audited tooling partner network — our own wire EDM, die-sinking EDM and CNC lines handle electrodes, punch and die steel.

Row of injection molding presses with part-removal robots

Injection Molding Workshop

Injection presses spanning 30–260 T across the molding floor, including automated vertical cells for insert molding, LSR and precision thermoplastic parts.

High-speed stamping press running metal inserts

Stamping & CNC Workshop

21 high-speed stamping presses (25–110 T) for metal inserts and brackets, alongside CNC machining holding ±0.005 mm.

Zeiss CMM running dimensional inspection on molded parts

Quality Control Lab

CMM, vision measurement and in-process sampling — every program ships with dimensional inspection data.

MOLDITQUICK factory front gate, Dongguan — IATF 16949 / ISO 9001 certified plant
Plant exterior — 10,000 m² facility, Dongguan, Guangdong
CNC machining center holding ±0.005 mm for molds and machined parts
CNC machining centers — mold cavities and precision machined parts
Low-speed wire EDM cutting mold electrodes and steel components
Wire EDM — precision cutting for electrodes and complex steel work

Every Program Under One Quality System

The biggest cost in a molded part is rarely the plastic — it is the hand-offs. When tooling, molding, stamping and inspection are split across suppliers, every transfer adds freight, lead time, communication overhead and a new place for tolerances to drift. Our factory is organized the opposite way: molding, stamping, CNC and inspection workshops run under one quality system and one ERP, with tooling managed by the same accountable team.

That structure is why we can move from DFM review to first articles without shipping a single file folder. It is also why a design change during tooling costs hours, not weeks — the toolmaker, process engineer and QC inspector report to one accountable team. You can see the mold making process and how parts are injection molded end to end.

Equipment & Capacity

  • Injection molding: injection presses spanning 30–260 T, with the vertical molding line running insert molding to ±0.02 mm insert positioning.
  • Wire EDM & tooling: wire-cut and die-sinking EDM capability, backed by CNC milling for cavities and inserts.
  • Stamping: 21 high-speed presses (25–110 T) producing metal inserts, brackets and terminals on-site.
  • CNC machining: precision milling and turning holding ±0.005 mm, used for prototypes, tooling components and machined parts.
  • Workforce: 280 employees across tooling, molding, stamping, finishing and quality.

Capacity planning is straightforward for buyers: low-volume runs quote at 7–12 days and mass production at 25–30 days, with global shipping from Dongguan. Comparable on-site factories quote 50–10,000 low-volume parts in about 15 days — a good sanity check for the lead-time range an on-site factory should be quoting.

Full Equipment Inventory

ProcessMachines on floorCapacity notes
Injection molding30–260 T injection presses · automated vertical insert-molding cellsHorizontal line runs production molding; vertical line runs insert molding and LSR
Tooling & EDMWire-cut EDM · die-sinking EDM · CNC millingElectrodes, punch and die steel, complex cavity work — tooling programs run through an audited tooling partner network
CNC milling & turningHigh-speed CNC machining centers · gantry mills · precision turning lathesMold plates, inserts and ±0.005 mm machined parts; also CNC prototype runs
Grinding & finishing steelSurface grinders (Mitsui, Wasino GLS-5T optical profile) · centerless grinderGround details for punch and die steel, hardened insert faces
Stamping21 high-speed presses, 25–110 T (incl. gantry feed lines)Metal inserts, terminals and brackets feeding insert molding the same day
Secondary opsUltrasonic welding · terminal grinding · pad-printing/finishing linesWelded assemblies and marked parts without shipping out
MetrologyZeiss CMM · 2D optical projectors · Trimos height gauges · hardness, coating-thickness, force and leak-test benchesFull dimensional and functional reports — see the quality control page
Vertical injection molding machine running insert molding
Vertical press — insert molding and LSR programs
Gantry CNC machining center cutting mold plates
Gantry CNC — mold plates and large components
Quality control lab interior with inspection benches
QC lab — every program ships with data

Why Facilities Matter to Your Program

Facilities are not decoration — they are a risk map. One accountable tooling program means your mold is not hostage to a supplier backlog. Stamping on our site means metal inserts arrive when molding needs them, not when a supplier ships them. An on-site QC lab means first articles are measured before the press runs a thousand parts, not after. Learn how those checks are structured on our quality control page, or read about the company behind the factory on the about page.

Frequently Asked Questions

Can you make both the mold and the parts?

Yes — we deliver mold design, mold build and molding as one accountable program under one quality system, from DFM to the first production shot.

What machine sizes do you run?

Horizontal presses from 40 to 100 tonnes and vertical presses from 45 to 120 tonnes — a 30–260 tonne range covering small precision parts through medium housings and insert-molded components.

Do you do metal stamping on-site?

Yes, 21 high-speed presses produce inserts, brackets and terminals on-site, so insert molding does not depend on an outside stamping supplier.

How fast are low-volume lead times?

Low-volume runs typically ship in 7–12 days and mass production in 25–30 days, depending on part geometry, material and finish.