MOLDITQUICK

SERVICES

PEEK Injection Molding

We mold PEEK at 360–400 °C — a melt window so narrow that a 2 °C drift can embrittle an entire batch. That is why we run it on automated presses with ±1.5 °C closed-loop control, molding unfilled, 30 % glass-fiber-reinforced and medical-grade PEEK for functional, structural and aesthetic parts — from low-volume bridge runs to high-volume production.

THE REAL DECISION

Small-Batch Sourcing, Done Right vs. Done Wrong

Low-volume buyers usually hit one of two paths. The wrong one costs months and doubles the budget; the right one gets real production parts in your hand in weeks. Here is what separates them.

The wrong path: thermal degradation in the barrel

PEEK must stay molten at 360–400 °C, but long residence times or unstable barrel heating degrade the polymer — the melt yellows, crystallinity drifts, and parts come out embrittled with lost chemical resistance. The damage often only surfaces at testing — or in service.

The wrong path: standard machines pressed into PEEK service

A conventional press cannot reach — or hold — the 360–400 °C barrel and 150–200 °C mold window PEEK demands. Cold molds breed cold slugs and amorphous, weak parts; undersized heaters turn every cycle into a lottery on the most expensive resin in the shop.

WHAT WE OFFER

The Route That Fits Your Order

Cost & Process Realities of PEEK

What makes PEEK expensive — and how we keep the cost under control.

Material cost is high

PEEK resin costs multiples of engineering plastics — part design, gating and scrap control decide the bill.

  • Net-shape molding
  • Minimal runner waste
  • Regrind strategy with supplier approval

Tooling must run hot

Molds run at 150–200 °C with hot runners and hardened steel; cold slugs destroy quality.

  • Hot runner systems
  • High-temperature mold steel
  • Modular PEEK-dedicated designs

Processing demands precision

A 2 °C deviation can crystallize and embrittle an entire batch — machines must hold ±1.5 °C.

  • Automated presses
  • Closed-loop temperature
  • First-shot success 92 %+

Alternatives when budget bites

PEKK needs only 10–15 °C more than PEEK; PEI (Ultem) covers continuous use to 170 °C at medium cost.

  • PEKK upgrade path
  • PEI for sub-170 °C service
  • PPS for heat and chemical balance

Surface & tolerance control

PEEK parts hold tight tolerances with 0.1–0.5 % shrinkage; we verify with first-article measurement.

  • 0.1–0.5 % shrinkage
  • First-article verification
  • GD&T reporting

PEEK vs PEI: Which High-Temperature Resin Fits?

Continuous use temperaturePEEK 250 °C vs PEI 170 °C — PEEK is mandatory above 200 °C.
Melting point / TgPEEK melts at 343 °C with a Tg of 217 °C; PEI is amorphous.
Tensile strengthPEEK ~100 MPa vs PEI ~85 MPa.
StiffnessPEEK flexural modulus ~3.6 GPa vs PEI ~3.0 GPa.
ProcessingPEEK barrel 360–400 °C / mold 160–180 °C; PEI barrel 340–370 °C / mold 140–160 °C with shorter cycles.
Chemical resistancePEEK resists strong acids and organic solvents; PEI resists fuels and weak acids but is poor against alkalis.
CostPEEK material cost high; PEI medium — choose PEI under budget constraints, PEEK for long high-heat service.
Radiation & sterilizationPEEK survives gamma sterilization; PEI is suitable for steam sterilization.

Where PEEK Injection Molding Pays

Aerospace

Satellite components, oil seals and high-load bushings that must keep properties above 200 °C.

Medical

Surgical instruments, minimally invasive tools with walls under 0.1 mm, and FDA-certified implantable components.

Semiconductor

Wafer carriers, chamber components and high-temperature process hardware.

Oil & gas

Deep-well exploration seals rated to 150 MPa pressure.

Robotics & industrial

Joint and wear components where creep resistance and self-lubrication beat metal.

Automotive & motorsport

High-temperature seals, thrust washers and sensor components under the hood.

Downhole & subsea

Insulators, connectors and seals that face high pressure and aggressive fluids.

PEEK: The Ultra-High-Performance Thermoplastic

MOLDITQUICK runs PEEK on automated presses with closed-loop temperature control; property values follow industry PEEK reference data.

Continuous service at 260 °C with short-term tolerance to 300 °C — the highest of melt-processable thermoplastics.

Tensile strength 90–100 MPa and about 4× the wear resistance of PTFE.

Low shrinkage (0.1–0.5 %) with a thermal expansion coefficient close to aluminum — dimensionally stable across temperature.

Biocompatible — FDA-certified grades used in long-term implants without rejection.

Cryogenic resistance — retains strength down to −60 °C.

Chemical resistance — survives strong acids (except concentrated H₂SO₄) and organic solvents.

Radiation resistance — PEEK tolerates gamma sterilization and nuclear environments, useful in medical and aerospace.

Low outgassing — suitable for semiconductor vacuum and cleanroom applications.

PEEK Grades We Mold — From Unfilled to 30 % GF

Grade families selected at DFM against your thermal, mechanical and regulatory requirements — all molded on-site on dedicated high-temperature machines.

Unfilled PEEK — ductile with very low shrinkage (0.1–0.5 %), for seals, bushings and thin-wall geometry.PEEK 30 % GF (glass-fiber reinforced) — higher stiffness and creep resistance for structural, high-load parts.PEEK CF (carbon-fiber reinforced) — maximum strength-to-weight and wear resistance for aerospace and robotics.Medical-grade PEEK — FDA-certified, biocompatible grades for long-term implants and surgical instruments.Static-dissipative PEEK grades — for semiconductor wafer handling and cleanroom hardware.PEKK and PEI (Ultem) alternatives — when the property profile or budget favors a close cousin of PEEK.

PEEK Processing Parameters We Control

Melt stability is the difference between a good and a scrap PEEK part. The windows below follow industry PEEK processing data and are verified on-site on our presses.

ParameterRecommended RangeWhy It Matters
Barrel temperature340–400 °C (: 360–400 °C)Melt must stay hot and stable; deviations of even ~2 °C can cause crystallization and embrittlement.
Mold temperature150–200 °C (typical 160–180 °C)Hot molds prevent cold slugs and promote crystallinity for maximum strength.
Mold shrinkage0.1–0.5 %Very low and predictable — close to metal-like dimensional stability.
Melt stability±1.5 °C closed-loop controlClosed-loop control delivers first-shot success above 92 % on thin-wall PEEK with automated machines.
Drying150 °C, ~3 hPEEK absorbs little moisture, but surface moisture must be driven off before molding.

FAQ

PEEK Injection Molding — FAQ

Can you help with product development?

Yes. From design review and material selection to prototyping, tooling and mass production — our engineers support you through the entire product lifecycle.

Do you ship internationally?

Yes. We ship worldwide via air and sea freight, with export packing, documentation and delivery tracking handled by our team.

What quality inspections do you perform?

First article inspection, dimensional measurement, material verification and surface checks — with inspection reports provided per batch. Full details are agreed before production.

What is the difference between rapid and production tooling?

Rapid tooling uses softer materials and simplified construction for fast, low-cost validation runs (hundreds to low thousands of parts). Production tooling uses hardened steel for high-volume, long-life programs.

How long does injection mold making take?

Rapid tooling prototypes can be ready in days; production tooling typically takes several weeks depending on complexity, cavity count and steel grade. We confirm a detailed schedule with your quotation.

Do you provide DFM feedback?

Yes. Every quotation includes a design-for-manufacturing review: draft angles, wall thickness, gate and weld-line locations, tolerance recommendations and cost-saving suggestions — before any tooling is cut.

What file formats do you accept?

We accept STEP, IGES, STL, X_T and 2D drawings (PDF or DWG). A 3D model lets us quote most accurately; 2D drawings are used to confirm critical tolerances and specifications.

How do I get a quote?

Upload your 3D file (STEP, IGES, STL or X_T) through the quote page, or email it directly. Our engineers review the design, run a DFM check and send you a detailed quotation — usually within one business day.

Ready to Start Your PEEK Injection Molding?

Factory-direct pricing, ISO-certified quality and rapid lead times. Send your spec and volume, get a quote within 24 hours — DFM review included.