3D Printing Service China — Complete Buyer Guide (2026)

RCRay Chan·2026-10-25·27 min read
Table of Contents

Why buyers source 3D printing from China

Most of the buyers who land on this page found it the same way: they typed a search query, opened four supplier tabs, sent the same STEP file to each, and got back four quote sheets that could not be compared line by line. One price was per cubic centimetre, one was per part with support removal billed separately, one excluded the surface finish that made the part usable, and one was simply a reseller marking up a factory two provinces away. The spread between the cheapest and the most expensive quote for an identical part is routinely 3× — not because one shop is greedy, but because the four quotes describe four different scopes.

The demand itself is real. China holds a large share of the world’s installed additive manufacturing capacity, and a China 3D printing service is usually the fastest route from a finished CAD model to a part in your hand — often inside a single working week, including international courier. What is not automatic is the engineering discipline behind the invoice.

This guide is about that discipline. It covers what each printing process actually holds on tolerance and finish, how a price is really constructed, how to read a lead time, how to keep your CAD and your product out of the wrong hands, and the exact conditions under which printing stops being the right answer and you should be ordering a machined prototype or a soft-tooled molded part instead. Every number below is either from a published capability table or a named standard; where a figure could not be sourced it is marked 【待确认】 rather than invented.

The Snapshot

  • Stereolithography (SLA) holds ±0.0508 mm (±0.002 in) with a 0.0634 mm minimum feature and a 736 × 635 × 533 mm build envelope (Protolabs published capability).
  • Selective laser sintering (SLS) is coarser but tougher: ±0.254 mm tolerance, 0.762 mm minimum feature, 482 × 482 × 431 mm build.
  • Multi Jet Fusion (MJF) runs ±0.305 mm with a 0.508 mm minimum feature and a 281 × 378 × 378 mm build.
  • Prototyping FDM is the loosest common process at ±0.5 mm with a 0.2 mm minimum feature — useful for form, not for fits.
  • Metal printing (DMLS-class) holds ±0.076 mm with a 0.1524 mm minimum feature in a 245 × 245 × 330 mm envelope.
  • A typical quoted turn time from a Chinese prototype shop is 4–7 working days for printed parts and 7–15 working days for low-volume production, against a 24-hour engineering quote turnaround (FirstMold published service claims).
  • The switch point: above roughly 500–1,000 units a year, or as soon as a printed part’s unit cost stops falling with quantity, injection molding or rapid tooling usually wins on unit price.

Table of Contents

  1. Why buyers source 3D printing from China
  2. The Snapshot
  3. What a China 3D printing service is actually quoting
  4. Process by process: SLA, SLS, MJF, FDM and metal
  5. Tolerance and surface finish by process
  6. Minimum feature size and why small parts fail
  7. Material choice for prototypes that must survive testing
  8. How the price is actually built
  9. Lead time: what “three days” really means
  10. Surface treatment after printing
  11. Prototype to production: when to stop printing
  12. CNC prototyping and vacuum casting as companions
  13. How to vet a China 3D printing supplier
  14. Protecting your CAD and your product
  15. Shipping, duty and packaging
  16. Quality documentation for printed parts
  17. Common failure modes and how to design around them
  18. Frequently Asked Questions
  19. Sources
  20. Related resources

What a China 3D printing service is actually quoting

Four quotes for the same part differ because they are not the same product. When you read a quote sheet, separate it into these layers:

  • Machine time — build hours occupied by your part, including the share of the build plate you displace. Powder processes (SLS, MJF) allow nesting, so small parts share a build; resin processes (SLA) tie up the whole platform.
  • Material consumed — for powder bed fusion, all powder in the build volume is affected, and the reusable fraction depends on the shop’s refresh policy. Ask what refresh ratio they apply, because it changes both price and mechanical properties.
  • Support and post-processing — support removal, ultrasonic cleaning, resin draining, bead blasting, sanding. This is the line most often omitted from a headline price and added later.
  • Finishing for function — tapping, thread inserts, media blasting, primer, paint, clear coat, dyeing. Aesthetically acceptable is not the same as dimensionally acceptable.
  • Engineering time — model repair, orientation choice, support strategy, and occasionally a design change that saves you a print. Good shops charge for this openly; bad shops hide it in a “tooling” line.
  • Freight and export handling — international courier, insurance, commercial invoice and packing. For small prototype batches this can be 10–25% of the invoice.

A quote that only states a unit price, with no process, no material grade, no layer height, no finish and no measurement report, is not a quote. It is an estimate of an unknown object. The same scope problem starts before the quote: 3D printing services China-based and elsewhere look identical on a landing page, and only the specification round separates the shops that engineer parts from the shops that resell them.

The practical fix is to send a specification, not just a file. State the process, the material grade, the critical dimensions with their tolerances, the finish required on which faces, and the measurement report you expect. Suppliers quote accurately against a specification and optimistically against a bare STEP file — and the difference surfaces at incoming inspection, not at the quote stage.

Process by process: SLA, SLS, MJF, FDM and metal

Each process occupies a different corner of the accuracy-versus-toughness map. Choose the process first, then the supplier, not the other way round.

Stereolithography (SLA). A laser or projector cures liquid photopolymer layer by layer. It is the accuracy and surface-finish leader among plastics: fine features, smooth surfaces, transparent and medical-grade resins available. Its weakness is environmental stability — photopolymers are sensitive to UV and humidity, and thin sections can creep under sustained load. Use SLA for visual models, master patterns for vacuum casting, fluid-path prototypes, and any part where a fine surface finish matters more than impact strength.

Selective laser sintering (SLS). A laser fuses nylon powder (typically PA12, PA11, or glass-filled variants) without support structures, because the surrounding powder supports the part. That single property is why SLS is the default choice for functional prototypes with undercuts, internal channels and stacked geometry. Parts are isotropic in-plane, tough enough for snap fits and living hinges in the right grade, and can be dyed. Surface is grainy and needs blasting.

Multi Jet Fusion (MJF). An inkjet array deposits fusing and detailing agents across the powder bed, then a lamp fuses each layer. It produces more consistent mechanical properties and better surface detail than SLS at comparable speed, in nylon PA12 and PA11 grades, and it nests well for batch production. Detail agent defines edges sharply, which matters for small text and fine ribs.

Fused deposition modelling (FDM). Extruded thermoplastic filament. Strong in the Z direction weakness sense — parts are anisotropic, with interlayer strength typically well below in-plane strength. Tolerance is the loosest of the common processes. Use FDM for jigs, fixtures, brackets, large low-detail housings and anything where cost and size dominate over precision.

Metal printing (DMLS/SLM-class). Laser melting of aluminium, stainless steels 17-4 and 316L, titanium, Inconel and cobalt chrome. It is a production process for complex metal geometry — conformal cooling inserts, lightweight brackets, one-piece replacements for multi-part assemblies. It requires support removal, stress relief and often post-machining of critical interfaces, because as-built surfaces are not functional fits.

A note on capability claims: it is normal for a Chinese sourcing partner to offer all five processes from one engineering desk while only running some of them on its own floor. That is not a defect — it is how the industry is organised. What matters is that the engineering review, the process selection and the inspection report stay with one accountable team, and that the supplier tells you which steps are done where.

Tolerance and surface finish by process

The table below is the single most useful thing to keep in front of you during a quote review. Values are the published per-process tolerances and minimum feature sizes from Protolabs’ 3D printing capability tables, converted to metric where the source gives inches.

Process Typical tolerance Minimum feature Build envelope (mm) Surface as-built Best for
Stereolithography (SLA) ±0.0508 mm 0.0634 mm 736 × 635 × 533 Smooth, layer lines faint Visual models, fine detail, casting masters
Selective laser sintering (SLS) ±0.254 mm 0.762 mm 482 × 482 × 431 Grainy, matte Functional prototypes, undercuts, ducts
Multi Jet Fusion (MJF) ±0.305 mm 0.508 mm 281 × 378 × 378 Fine grain, sharp edges Batch nylon parts, small text, ribs
PolyJet ±0.127 mm 0.305 mm 490 × 391 × 200 Very smooth Elastomer and multi-material models
Advanced photopolymer ±0.05 mm (Tough Black ±0.25 mm) 0.5 mm (Tough Black 2.55 mm) 249 × 140 × 499 Smooth Engineering-grade resin parts
Prototyping FDM ±0.5 mm 0.2 mm 500 × 500 × 500 Visible layer lines Jigs, brackets, large housings
Metal (DMLS-class) ±0.076 mm 0.1524 mm 245 × 245 × 330 Rough, requires post-machining Conformal cooling, lightweight metal geometry

Three reading rules make this table useful rather than decorative:

  1. Tolerance is not uniform across a part. For resin and powder processes, the achievable band in the XY plane differs from the Z direction, and thin walls distort more than solid sections. Quote the tolerance you need on the critical features only.
  2. Minimum feature is the harder limit. A shop that can hold ±0.05 mm on a solid block cannot produce a 0.2 mm rib in the same material, no matter what the tolerance column says.
  3. Post-processing changes the number. Bead blasting can add or remove tens of microns on a fine edge. If a face is a datum, mask it before finishing, and validate after finishing.

Compare those numbers with what molding achieves: a well-run injection mold holds ±0.05 mm routinely, down to ±0.01 mm on critical features, with surface finish from a matte texture to a polished Class A face. Printed parts compete on speed and geometry freedom, not on tolerance. If your fit stack needs ±0.05 mm across a mating pair, budget for printed prototypes plus a machined or molded production path.

Minimum feature size and why small parts fail

Most rejected first articles from 3D printing fail for one of five reasons, and all five are design-side:

  • Feature below the process minimum — a 0.4 mm snap hook on an SLS part (minimum feature 0.762 mm) will print, but not as a hook.
  • Wall thickness below three times layer height in the load direction, which reads as a paper-thin shell that warps.
  • Sharp internal corners concentrated stress. Add radii; a 0.5 mm radius is usually free and doubles fatigue life at a corner.
  • Trapped powder or resin in blind cavities — a design that cannot be cleaned is a design that will ship contaminated.
  • Unsupported overhangs in FDM and SLA, which is a support-strategy question rather than a design flaw, but it changes price and surface finish on the underside.

A short DFM review before printing catches all five. On a 30-part prototype run, the cost of one review round is far below the cost of one scrapped build — and the review is the moment when a supplier demonstrates whether they have engineers or only a quoting desk.

Material choice for prototypes that must survive testing

A prototype that must be dropped, torqued, boiled or chemically exposed needs a material chosen for the test, not for the process. Match the test to the grade:

Requirement Printed material Verify with
General form and fit SLA standard resin, PA12 (SLS/MJF) Dimensions only
Snap fits, living hinges, repeated assembly PA12 or PA11 (SLS/MJF), engineering resin Cyclic assembly test, tensile per ISO 527 / ASTM D638
Drop and impact resistance PA11, impact-modified nylon, TPU Charpy/Izod per ISO 179 / ASTM D256 at part temperature
Chemical or fuel contact PA12, PP-like grades Immersion test in the actual fluid, 7 days
Heat exposure Glass-filled nylon, PEEK only via high-temp processes HDT per ISO 75 at the service load
Electrical insulation or flame rating Flame-retardant resin grades UL 94 rating on the actual printed geometry and thickness
Transparent optics Clear SLA resin, polished Light transmission and haze measurement

Two practical warnings. First, datasheet values are for molded specimens, not printed ones — an SLS or MJF part typically shows lower elongation than the same resin molded, and the direction of the build matters. Treat datasheet numbers as a ceiling. Second, anisotropy is real in FDM and detectable in powder processes at the build-Z direction; if the part carries load in one axis, orient the build so that axis is in-plane, and say so on the purchase order.

How the price is actually built

Printed-part price is a function of four variables, in this order of impact:

  1. Build volume displaced, not part weight. Two parts of equal mass can differ 3× in price if one is a thin shell occupying a big envelope.
  2. Process and layer height. Finer layers mean more passes; halving layer height can approach double the machine time.
  3. Nesting efficiency. In powder bed processes, parts that tile well share a build and split machine cost. One tall part that forces a full-height build pays for all of it. This is why a redesigned part, split into two printable halves, sometimes costs less than the single piece.
  4. Post-processing labour. Support removal on SLA, thorough powder evacuation on SLS, and any manual finishing are hand work, and hand work does not scale with quantity.

Volume effects are much weaker in printing than in molding. Printing has almost no tooling to amortise, so unit price barely falls from 1 to 100 pieces; molding has heavy tooling and a steep learning curve, so unit price collapses from 1,000 to 100,000. That is the entire economics of the prototype-to-production transition, and it has a consequence buyers often miss: printing is not “expensive molding”, it is a different cost model, and comparing a 100-piece printed quote with a 100-piece molded quote tells you almost nothing about which is right at 10,000.

For a printed part, expect the quote to break down roughly as material plus machine time plus finishing plus a setup charge — and expect a professional shop to show a rebuild cost if you change the design. If a supplier cannot tell you their layer height, their material grade or their build orientation assumption, they are quoting a shape, not a part.

Lead time: what “three days” really means

Published service claims from Chinese prototype shops put 4–7 working days on rapid prototyping and 7–15 working days on low-volume production, with quotations inside 24 hours (FirstMold’s published service terms). Those numbers are achievable and also routinely missed, for reasons that are predictable:

  • Working-day accounting. Chinese public holidays (Spring Festival, National Day week) are not Western holidays. A quote issued on 28 September with a 7-working-day promise lands after the first week of October, not before it. Always convert to calendar dates in writing.
  • Build queue versus build time. Machine time for a small SLA batch may be 8 hours; queue time in a busy shop can be 3 days. Ask “when does it enter the build?” not “how long does it take?”
  • Material in stock. PA12 is universal. PEEK, PEI, flame-retardant and medical grades are not, and a 2-week material lead time sits inside your “5-day prototype”.
  • Finishing and inspection add a full day and are frequently excluded from the promise.
  • Export handling — courier pickup cut-off times, commercial invoice, and customs clearance at destination. A 3-day build can become a 9-day delivery.

The remedy is a milestone schedule on the purchase order: file release, DFM feedback, build start, build end, finishing complete, inspection report issued, shipment collected. Five dates, written down, convert a marketing claim into a commitment.

Surface treatment after printing

As-built surfaces rarely match a product requirement. Standard options and what they change:

  • Bead blasting / sandblasting — removes sinter skin and unifies appearance on SLS and MJF; removes a few tens of microns of material, so mask datums.
  • Sanding and polishing — hand work; on SLA it can bring a surface to optical clarity, on SLS it is slow and expensive.
  • Dyeing — nylon takes dye well and uniformly; colour is cosmetic and not UV-stable indefinitely.
  • Primer and paint — the standard route to a Class A look; requires sanding between coats, and paint thickness must be accounted for in any fit.
  • Vapour smoothing — solvent smoothing for some resins; improves finish, slightly softens fine detail.
  • Metal plating on printed polymer — possible but adds process steps and needs a conductive seed layer; expect longer lead time and a per-part price that surprises people.

For medical and food-contact applications, note that surface treatment can compromise biocompatibility of a validated resin, and the cleaning protocol must be validated after finishing, not before.

Prototype to production: when to stop printing

Printing stops being the right answer when the binding constraint stops being geometry and starts being unit cost, material properties or repeatability. In practice the transition happens on one of four signals:

  1. Unit price flattens. Printed unit price barely falls with quantity, so once your annual volume crosses a few hundred to a thousand units, compare against low-volume production with a soft tool. Bridge tooling in aluminium or P20-class steel makes real production parts in weeks, not months.
  2. The material has to be the production material. If the part must be PP with a specific shrinkage behaviour, PC/ABS with a UL rating, or glass-filled PA66 for under-hood heat, printing a proxy material only proves shape, not function. Move to molding so you test the real resin.
  3. Tolerance stack needs consistency, not best-effort. Printed parts hold a distribution; molded parts hold a capability. When the drawing calls for Cpk ≥ 1.33 on a critical dimension, you are in molding territory.
  4. Cosmetics must be repeatable. Texture, gloss and colour match across thousands of parts is a mold-surface and process-control problem, not a printing problem.

The transition does not have to be a leap. The standard ladder we recommend to buyers is: printed prototypes → CNC-machined functional prototypes in production resin → rapid (soft) tooling for pilot builds → production tooling. Each rung buys a specific risk reduction, and each rung should be entered only when the previous one has answered its question. A DFM checklist review belongs at the transition, when design changes are still free.

CNC prototyping and vacuum casting as companions

Printing is not the only fast route, and mixing routes usually produces a better prototype programme than committing to one.

CNC prototyping cuts the production-grade material directly, holding ±0.005 in (±0.127 mm) on standard features with hole and bore tolerance down to ±0.0005 in (±0.0127 mm), quoted to ISO 2768-1 classes f (metals) and m (plastics) per Protolabs’ published machining guidelines. It is the correct choice when the material itself is under test — machined PP behaves like molded PP; a printed proxy does not.

Vacuum casting (urethane casting from a printed or machined master) produces 20–50 parts in a soft silicone mold in a few days. It is the cheapest way to make a small pilot batch in a resin that approximates an engineering plastic, and it is the classic step between a printed model and a steel tool.

Rapid tooling — aluminium or soft steel molds — turns the same CAD into hundreds to thousands of molded parts in weeks. When the part is destined for injection molding, a rapid tooling pilot is often the cheapest way to prove the design before spending on production steel.

The pattern that wastes least money is: print to check geometry, machine to check material, tool to check process. Each step is more expensive per part and answers a question the previous step could not.

How to vet a China 3D printing supplier

Ask these ten questions before releasing a file. The answers separate engineering-capable suppliers from forwarders with a website.

  1. Which processes run on your own floor, and which are subcontracted? Both answers are acceptable; an evasive answer is not.
  2. What tolerance do you quote, on which faces, and how do you verify it? Ask for a sample measurement report with a CMM or VMM trace.
  3. Which material grade and which supplier? “PA12” is not a grade specification; “PA12, manufacturer X, lot traceable” is.
  4. What refresh ratio do you use for powder? It affects ductility, and good shops will tell you.
  5. What is your DFM process and when do I see it? Before the build, in writing.
  6. Can you machine critical interfaces after printing? For metal parts this is nearly mandatory.
  7. What is your first-article and non-conformance process? Ask for the last CAPA you closed.
  8. Which quality system is certified, and by whom? ISO 9001 is baseline; ISO 13485 for medical, IATF 16949 for automotive, AS9100 for aerospace. Ask for the certificate number and scope, then verify it.
  9. How do you handle my CAD data and NDAs? See the next section.
  10. What are the real shipping dates, in calendar terms, including holiday weeks?

Ten questions, one file, one week of replies. The comparison you get is worth more than any price list.

Protecting your CAD and your product

Your STEP file is your intellectual property. Treat the transfer as a controlled event:

  • Sign the NDA before sending files, and make it specific: definition of confidential information, term, jurisdiction, and a clause covering subcontractors. A generic one-page NDA does not cover a subcontractor two provinces away.
  • Send only what is needed. Strip assembly references, appearance textures, cost tables and drawing notes you do not want quoted. For a fit check, a simplified solid is enough.
  • Watermark drawings with the recipient’s name and date. Leaks become traceable.
  • Ask which subcontractors will see the model, and require the same NDA chain.
  • Keep the tooling ownership in writing. For molded parts, state that the mold is your property and is returnable; for printed parts, state that no derived data (meshes, support strategies) may be reused.

None of these are exotic. They are the difference between a supplier relationship and exposure. In practice, the shops that resist an NDA are the ones that also resist a measurement report.

Shipping, duty and packaging

Prototype shipments are small, light and disproportionately expensive to move. The practical points:

  • Courier is the default for parts under a few kilograms — express air, door to door, 2–5 working days transit after pickup, with the cost driven by volumetric weight rather than mass.
  • Volumetric weight punishes bulky parts. A large, light shell is billed on box dimensions; splitting a part into stackable sections can cut freight more than it costs to print.
  • Declared value and HS classification must match the invoice. Prototypes are usually declared at cost, and mis-declaration is a customs problem, not a paperwork problem.
  • Insurance on high-value prototype shipments is cheap relative to the replacement lead time; take it.
  • Packaging for fragile geometry — SLA parts are brittle; bag each part, foam-separate, and specify “no bag-on-part contact for polished faces”.
  • Keep the inspection report in the shipment, not only in email. Parts and paperwork should arrive together, or incoming inspection stalls.

Quality documentation for printed parts

What to require depends on the downstream use:

  • Dimensional report on the drawing’s critical dimensions, with the measurement method and instrument.
  • Material certificate — grade, lot, and the manufacturer’s datasheet.
  • Build record — machine, orientation, layer height, post-processing steps. This is how a defect gets traced back to a cause.
  • First article inspection (FAI) for production-intent parts, in the AS9102 sense for aerospace work.
  • Non-conformance log with disposition (use-as-is, rework, scrap) — and a rework route that is validated, not improvised.
  • Traceability for regulated work — ISO 13485 for medical devices puts process validation, cleanroom status and biocompatibility documentation in scope, not only dimensions.

For most prototype programmes, the dimensional report plus material certificate is enough. For anything that will be qualified and then molded, add the build record, because the printed part is often the reference sample that the molded part gets compared against.

Common failure modes and how to design around them

Failure Root cause Design or process fix
Warped flat face Uneven cooling, thick-to-thin transitions Uniform wall, ribs instead of thick bosses, orient to minimise warp axis
Snap fit breaks on first assembly Feature under minimum, brittle resin, wrong build orientation Feature ≥ 3× process minimum, ductile grade, build in-plane
Threads strip Printed threads are not functional at small sizes Design a boss for a metal insert, install after printing
Powder trapped in cavity Blind pockets, no escape path Add escape holes ≥ 2 mm, or split the part
Dimensions fail on inspection Finish removed material from datum faces Mask datums, inspect after finishing, agree measurement method
Colour mismatch between batches Dye lot and sinter variation Specify dye lot, accept ΔE tolerance, or paint
Crack at layer interface (FDM) Anisotropic Z strength Rotate build, increase wall count, or switch to SLS/MJF

Frequently Asked Questions

1. How tight a tolerance can a China 3D printing service hold? It depends on the process, not the country. Published capability tables put SLA at ±0.0508 mm, SLS at ±0.254 mm, MJF at ±0.305 mm, PolyJet at ±0.127 mm, prototyping FDM at ±0.5 mm and DMLS-class metal at ±0.076 mm. Ask which process your quote is for before comparing tolerance claims between suppliers.

2. What is the minimum order quantity? For printing, one part is a valid order. Builds are shared or nested, so a single prototype is normal and a 30-part batch is also normal. There is usually a minimum invoice value rather than a minimum quantity — expect a setup charge for a one-off.

3. How long does a prototype take, door to door? Published service claims are 4–7 working days for rapid prototyping and 7–15 working days for low-volume production, quoted inside 24 hours. Add customs and courier transit of 2–5 working days and add a buffer for Chinese public holidays, then convert everything into calendar dates on the purchase order.

4. Is 3D printing cheaper than injection molding? Only at low volume. Printing has almost no tooling and a nearly flat unit price; molding has significant tooling and a unit price that falls sharply with quantity. Below roughly a hundred units, printing usually wins; above a few hundred to a thousand units a year, low-volume production with a soft tool usually wins.

5. Which process should I choose for a functional nylon prototype with undercuts? SLS or MJF. Powder bed processes need no support structures, so undercuts, internal channels and nested geometry print without a support-removal penalty. Use SLS when you want the widest material choice and MJF when you want better surface detail and consistent properties across a batch.

6. Can printed parts be used as production parts? Yes, for low-volume, high-value and geometrically complex parts — ducting, brackets, jigs, replacement covers. They are not a drop-in substitute where the specification names a molded resin, a flame rating on a fixed thickness, or a Cpk requirement on a critical dimension.

7. How do I protect my design? NDA before file transfer, minimal data (strip textures and assembly references), watermarked drawings, written confirmation of which subcontractors will see the file, and a written statement that no derived data is retained or reused. See the IP section above for the full list.

8. What file format should I send? STEP (AP203 or AP242) for solids, because it carries geometry robustly. STL or 3MF for printing, with a stated chord tolerance. Send a PDF drawing alongside the model for every dimension that matters, since a model alone cannot express tolerance, finish or datum intent.

9. Why is my quote different from the last supplier’s quote for the same part? Usually scope, not margin: different process, different material grade, different layer height, support removal in or out, finishing in or out, and freight in or out. Normalise the scope in a specification before comparing numbers.

10. Can you print metal parts and then machine them? Yes, and for functional interfaces you should. As-built metal surfaces are rough and dimensional control on critical bores, sealing faces and bearing seats normally requires post-machining. Plan the machining allowance into the printed geometry.

11. What surface finish can I expect straight off the machine? SLA and PolyJet come out smooth with faint layer lines; SLS is grainy and matte; MJF is finer-grained with sharp edges; FDM shows visible layer lines; metal is rough. Finishing — blasting, sanding, dyeing, painting — is a separate line item and changes the dimension on the surface it touches.

12. Do printed parts need to be dimensionally inspected? For a fit-critical or production-intent part, yes. Require a dimensional report on the drawing’s critical dimensions with the instrument stated, and inspect after finishing rather than before, because blasting and polishing move surfaces by tens of microns.

13. How do you handle a part that fails inspection? A professional supplier issues a non-conformance report, states the root cause, and offers use-as-is, rework or reprint. Ask for that process in writing at the quoting stage; the answer tells you how the relationship will go when something goes wrong.

14. What certifications should a supplier hold? ISO 9001 as the baseline quality system; ISO 13485 for medical device work; IATF 16949 for automotive production parts; AS9100 for aerospace. Ask for certificate number and scope, and verify the scope covers the process you are buying, not only the trading entity.

Sources

  • Protolabs, 3D printing capability and tolerance tables (per-process tolerance, minimum feature size, build envelopes): https://www.protolabs.com/services/3d-printing/
  • Protolabs, CNC machining design guidelines (ISO 2768-1 class f/m, ±0.005 in / ±0.127 mm standard, ±0.0005 in / ±0.0127 mm hole tolerance): https://www.protolabs.com/services/cnc-machining/
  • FirstMold, 3D printing service page (SLA/SLS/FDM/MJF/SLM offer, surface treatment scope, published certification set): https://firstmold.com/3d-printing-service/
  • FirstMold, precision CNC machining service page (published quotation turnaround, 4–7 working days prototyping, 7–15 working days low-volume): https://firstmold.com/precision-cnc-machining-service/
  • ISO/ASTM 52900 — additive manufacturing general principles and process categories (terminology used for the process names in this guide).
  • ISO 2768-1 — general tolerances for linear and angular dimensions without individual tolerance indications.
  • ISO 527 / ASTM D638 — tensile properties of plastics (used for the material verification column).
  • ISO 179 / ASTM D256 — Charpy and Izod impact strength.
  • ISO 75 — heat deflection temperature under load.
  • UL 94 — flammability rating of plastic materials (rating applies to a specified thickness and geometry).
  • 【待确认】 Market-range pricing bands for printed parts by process — no single published source; to be filled from this site’s current quotation data before any publication use.

NEXT STEP

Ready to Start Your Project?

Send us your requirements — our team responds within 24 hours. Pricing and a realistic lead time come with the reply.