Most quoting errors on a molded part are not pricing errors. They are machine-fit errors that were never caught: a tool quoted on a press whose tie-bar spacing is 12 mm too narrow, a four-cavity tool that needs 157 g of shot capacity but was priced against a 130 g barrel, a part whose core needs 212 mm of opening stroke on a machine that offers 180 mm. The numbers are cheap to check and expensive to discover at trial.

This guide is the arithmetic a buyer or an engineer can run before a tool is cut. It covers shot capacity in polystyrene grams and the conversion for a real resin, clamping force from projected area and cavity pressure, the tie-bar and platen envelope, mold thickness against daylight and the opening-stroke rule S >= H1 + H2 + 5-10 mm, the nozzle and locating-ring interface, ejection stroke, drive types, and the failure modes that appear when the match is wrong.

Molditquick quotes molding programs against a machine matrix that spans small toggle presses through large two-platen machines, delivered through our mold-making and molding network. The parameters in this article come from a published injection molding machine reference, which is cited with its URL, and from standard arithmetic that you can re-run on your own part.

The Snapshot

  • 85% — the maximum share of a machine’s rated shot volume you should use for part plus runner, stated in published machine-selection guidance.
  • 20-40 MPa — the typical average cavity pressure band used to size clamp force, before any safety margin.
  • S >= H1 + H2 + 5-10 mm — the opening-stroke rule for a mold with a single parting surface.
  • 3,520,000 vs 3,520 — the particle counts that separate an ISO 8 room from an ISO 5 room, for parts molded under cleanroom conditions.
  • 0.5-2 s — how much longer than the measured gate-seal time a holding time is normally set, the parameter that decides whether sink appears near the gate.
  • 60-70% — a practical target for how much of a barrel’s capacity a single shot should occupy, so that residence time stays inside the resin’s thermal window.

Table of Contents

  1. The Snapshot
  2. What a Machine Specification Actually Tells You
  3. Shot Capacity and the 85 Percent Rule
  4. Clamping Force and the Tonnage Calculation
  5. Tie-Bar Spacing Platen Size and Mold Footprint
  6. Mold Thickness Daylight and Opening Stroke
  7. The Nozzle Locating Ring and Sprue Interface
  8. Ejection Stroke and Part Drop
  9. Drive Types and What They Change
  10. Horizontal or Vertical for Your Part
  11. Residence Time Screw Size and Cycle Fit
  12. The Machine Fit Checklist to Send With an RFQ
  13. Failure Modes of a Wrong Machine Match
  14. Frequently Asked Questions
  15. Sources
  16. Send Your Part Data for a Machine Match

What a Machine Specification Actually Tells You

A press has four limiting envelopes, and a quotation is only valid if the tool and the part sit inside all four. The first is shot capacity, expressed in grams of polystyrene. The second is clamping force, expressed in kilonewtons or tonnes. The third is the physical envelope: tie-bar spacing, platen size, minimum and maximum mold thickness. The fourth is travel: opening stroke and ejection stroke.

Published machine-selection guidance makes an important distinction that buyers routinely miss. Injection pressure on a machine datasheet is the highest pressure inside the barrel, not the highest pressure of the hydraulic oil, and the two relate through the ratio of screw cross-sectional area to shot-cylinder area. Injection rate is the volume of melt leaving the nozzle per unit time, which is the screw cross-section area multiplied by screw speed. Neither number is the pressure that reaches the cavity. Cavity pressure is what the part sees, and it is lower than the nozzle pressure because the runner and gate consume pressure.

That distinction explains why tonnage cannot be read off a datasheet. Two machines rated at the same clamp force can mold the same part differently if their injection units differ, because the machine that develops cavity pressure faster will fill the part at a lower peak pressure. The engineering consequence is simple: size the press from the part and the tool, then check the press against its own datasheet, never the other way round.

A machine is also a collection of subsystems that each fail in a different way. The injection unit carries the feeding device, barrel, screw and nozzle, plus the injection cylinder, injection seat, moving cylinder and screw drive. The clamping unit holds the mold closed against cavity pressure. The hydraulic unit converts fluid pressure into mechanical work. The electrical control unit, built around a PLC and a touch screen, provides the timing and feedback that make a process repeatable. Heating and cooling units condition the melt and the mold, lubrication reduces wear on the toggles and guideways, and the safety and monitoring unit is what stands between an operator and a closing mold. When a trial fails, the question is always which of these subsystems was the constraint.

Envelope Datasheet field What it constrains Typical mistake
Material per shot Shot capacity in PS grams Part plus runner weight Forgetting the runner, or forgetting density conversion
Clamp Clamping force in kN or tonnes Projected area times cavity pressure Using 20 MPa as a guarantee instead of a starting band
Width and height Tie-bar spacing, platen dimensions Mold base outside dimensions Quoting a mold before the base is laid out
Depth Minimum and maximum mold thickness Stack height of the tool Ignoring the extra plate on a three-plate tool
Travel Opening stroke, ejection stroke Part and runner drop, core pull Sizing stroke from part height only, not core height

If you want the mold side of this discussion first, the tool structure and steel choices are covered in injection mold components and mold-making materials.

Shot Capacity and the 85 Percent Rule

Shot capacity is quoted in grams of polystyrene because polystyrene has a density near 1.05 g/cm3 and everyone can compare against the same reference. Your resin is not polystyrene, so the usable capacity changes with density. Published guidance gives the conversion as m = c x b / 1.05, where c is the polystyrene-denominated shot capacity, b is the density of your resin, and m is the actual mass that fits in the barrel.

Two practical rules sit on top of that conversion. Keep the total shot — parts plus runner plus sprue — within 85% of the injection volume. Take the upper end of the range for amorphous resins and a lower figure for high-viscosity resins, because a barrel that is too full for a stiff melt leaves the screw short of plasticizing time and produces inconsistent cushion.

Here is the arithmetic on a real-shaped example. A four-cavity tool runs a 28 g ABS part. The runner and sprue weigh 22 g. Total shot is 112 + 22 = 134 g. Divide by 0.85 to get the minimum polystyrene rating: 134 / 0.85 = 157.6 g PS. A press rated at 200 g PS therefore has margin, since 200 x 1.05 / 1.05 = 200 g of ABS capacity, and 85% of that is 170 g.

Now run the same part in PC at a density of about 1.20 g/cm3. A 200 g PS-rated machine delivers 200 x 1.20 / 1.05 = 228.6 g of PC, and 85% of that is 194 g — still comfortable for a 134 g shot. Run the same part in a glass-filled grade at 1.35 g/cm3 and the capacity rises again to 257 g, but the abrasion on the screw and check ring rises with it, which is a wear question rather than a capacity question.

The 85% ceiling exists because the last 15% of barrel capacity is where the process loses control. Plasticizing time falls, melt temperature spreads across the shot, and the cushion becomes unstable. The instability shows up first as part-weight scatter, then as dimensional scatter, then as a customer complaint about fit.

Resin Density g/cm3 200 g PS machine capacity 85% usable
PP 0.90-0.91 171-173 g 145-147 g
ABS 1.04-1.06 198-202 g 168-172 g
PC 1.20 228.6 g 194 g
PA66 unfilled 1.13-1.15 215-219 g 183-186 g
PA66 GF30 1.35-1.37 257-261 g 218-222 g
POM 1.41 268.6 g 228 g
PEEK 1.30 247.6 g 210 g

Density values in this table are standard material data; the capacity column is the published conversion applied to them. If your supplier quotes a shot capacity without telling you the resin it was rated in, ask. It is the single most common source of an undersized press on a trial.

Clamping Force and the Tonnage Calculation

Clamping force holds the tool closed against the force the melt exerts on the cavity walls. Published guidance computes it as average cavity pressure multiplied by projected area, with average cavity pressure typically in the 20-40 MPa band. That band is wide on purpose: thin walls, long flow paths, low melt temperature and fast injection all push the required pressure toward the top of it.

Run the arithmetic. A four-cavity tool projects 45 cm2 per cavity, plus 20 cm2 for the runner, for a total projected area of 200 cm2. At an average cavity pressure of 30 MPa, which equals 300 bar, the separating force is 300 x 200 = 60,000 kgf, or about 60 tonnes. Apply a 15% allowance for gate freeze variation and part-to-part scatter and you need roughly 70 tonnes.

That result is not the end of the calculation, because the 20-40 MPa band is an average. A part with a 1.2 mm wall on a 180 mm flow path will sit near the top of the band. Re-run at 40 MPa and the same 200 cm2 tool needs 80,000 kgf, or 80 tonnes, before the allowance, and about 92 tonnes with it. The tool has not changed. The wall has. This is why a molder who quotes tonnage from a projected-area table alone will quote the same press for two parts that behave nothing alike.

Clamp force also sets the lower bound of what you can safely run. Too little clamp gives flash at the parting line, and flash is not a cosmetic problem only: it changes part weight, which changes the dimensional result. Too much clamp crushes vents, wears the parting surface and can distort the mold base over millions of cycles. The published empirical method starts at 90% of rated clamp at medium pressure and medium speed for three shots, then reduces clamp in 10-tonne steps until part weight rises about 5% and flash appears, then backs off. That procedure finds the real minimum for that tool in that machine, which is the only number worth recording in a setup sheet.

Projected area Cavity pressure Separating force With 15% allowance
50 cm2 20 MPa 10 t 11.5 t
50 cm2 40 MPa 20 t 23 t
200 cm2 30 MPa 60 t 69 t
200 cm2 40 MPa 80 t 92 t
600 cm2 30 MPa 180 t 207 t
600 cm2 40 MPa 240 t 276 t

For a longer treatment of projected area and flow length, including the flow-length-to-thickness ratio that predicts whether a wall will fill at all, see wall thickness in injection molding. The two calculations feed each other: wall thickness sets the pressure, and pressure sets the tonnage.

Tie-Bar Spacing Platen Size and Mold Footprint

The tie bars are the four columns that carry the clamp force. The distance between them is the hard limit on mold width and height, and it is checked before anything else in a tool layout, because a mold base that does not pass between the bars cannot be mounted at all. Published machine guidance puts mold length and width against the platen dimensions and the tie-bar spacing as a matching requirement, not a preference.

Three clearances matter. First, the mold base outside dimensions must clear the tie bars with enough room to swing the tool in during setup; a 5-10 mm total margin is workable on a small tool and a bad idea on a heavy one. Second, the mold feet must line up with the threaded-hole pattern on the moving platen, so the clamps have something to hold. Third, the sprue centre must sit on the barrel centreline, which is what the locating ring is for.

There is a subtler constraint that catches large tools: the platen deflects. A platen that is generously sized for a small mold will bow under full clamp on a mold that covers most of its face, and the bow shows up as uneven flash around a part with a large projected area. Published practice for large parts includes checking platen support and, where necessary, using a support plate or a larger machine rather than pushing a mid-size press to its rated tonnage.

Mold base Tie-bar spacing needed Typical press class Note
250 x 250 mm 310 x 310 mm or more Small toggle Swing-in clearance dominates
350 x 400 mm 410 x 460 mm or more Mid toggle Check mold-foot hole pattern
450 x 500 mm 510 x 560 mm or more Large toggle Verify platen hole pattern
600 x 700 mm 660 x 760 mm or more Two-platen Platen deflection becomes relevant
800 x 900 mm 860 x 960 mm or more Large two-platen Crane and floor space planning

Figures in the final three rows are typical class descriptions rather than a specific machine datasheet; confirm against the actual press before ordering steel.

Mold Thickness Daylight and Opening Stroke

Mold thickness has a floor and a ceiling on every machine. Too thin and the clamp cannot build tonnage without over-travel; too thick and the mold will not fit between the platens at minimum daylight. Published guidance states both the maximum and the minimum mold thickness as machine specifications, and buyers should ask for both rather than only the maximum.

The opening stroke rule for a mold with a single parting surface is S >= H1 + H2 + 5-10 mm, where H1 is the demolding distance, usually the core height, and H2 is the product height including the gating system. The 5-10 mm is clearance for the part to fall free.

Work an example. A housing is 85 mm tall and the core stands 120 mm above the parting line. The required stroke is 120 + 85 + 7.5 = 212.5 mm. A press with a 400 mm maximum opening stroke and a 350 mm mold height has a daylight of 350 + 400 = 750 mm, so the tool fits with room to spare. A press with a 200 mm stroke would not open far enough even though its tonnage and shot capacity were both adequate. This is the failure mode that produces a beautiful quotation and a mold that cannot run.

Three-plate tools change the number. The published rule notes that a three-plate mold needs the opening distance increased by the separation distance between the fixed mold half and the gate plate, because the tool opens in two stages. A three-plate tool with a 150 mm runner-plate separation therefore needs roughly 150 mm more stroke than a two-plate tool of the same part. If you are comparing a two-plate and a three-plate architecture for the same part, the stroke requirement belongs in the comparison — which is covered in detail in two plate versus three plate mold.

Part height Core height Required stroke Press stroke needed
30 mm 50 mm 87.5 mm 150 mm
60 mm 80 mm 147.5 mm 200 mm
85 mm 120 mm 212.5 mm 300 mm
120 mm 160 mm 287.5 mm 400 mm
200 mm 250 mm 457.5 mm 550 mm

The Nozzle Locating Ring and Sprue Interface

Three interfaces must align before a shot is possible, and each has a published matching rule. The sprue centre on the mold must align with the barrel nozzle centreline. The locating ring on the mold must match the locating hole on the fixed platen with a clearance fit — a press fit here means the tool will not seat, and an oversize ring means the sprue misaligns by whatever the play allows. The spherical radius of the machine nozzle must match the spherical radius at the start of the sprue on the mold.

The radius mismatch is the one that produces mystery. If the nozzle radius is smaller than the sprue radius, melt escapes at the interface and forms a string or a flash ring that eventually blocks the sprue. If the nozzle radius is larger, contact is a line rather than a surface, heat transfer falls, and the sprue freezes before the shot completes. Published sprue design guidance makes the corresponding mold-side number explicit: the sprue bushing spherical radius should be the machine nozzle radius plus 1-2 mm.

Sprue geometry itself is worth checking in the same pass. The small-end diameter is roughly the nozzle diameter plus 0.25 mm, the taper angle is 2-4 degrees, and a sprue longer than about 150 mm starts to lose pressure and heat. Those numbers belong in the tool drawing, and they belong in the RFQ pack so that the molder can confirm the nozzle on the intended press.

Interface Mold side Machine side Rule
Locating ring Ring outside diameter Platen locating hole Clearance fit
Nozzle radius Sprue bush SR Nozzle SR Bush SR = nozzle SR + 1-2 mm
Sprue small end Diameter d Nozzle orifice d = nozzle diameter + 0.25 mm
Sprue taper Included angle Not applicable 2-4 degrees
Sprue length Overall Not applicable Keep at or below 150 mm

Ejection Stroke and Part Drop

Ejection stroke is fixed per machine, and published guidance recommends ordering a longer stroke than the current part needs, because the next part on the same tool family usually needs more. The stroke must clear the part from the core, and on a deep draw that means the ejector plate travel has to exceed the core height plus clearance.

Two things go wrong when ejection is undersized. The part is dragged off the core instead of pushed, which leaves scuffing on the side wall and stretch marks at the base. Or the part falls onto the tie bars instead of the chute, which becomes a manual intervention and destroys cycle consistency at volume. The second problem is cheap to fix at tool design time with a drop chute or a robot take-out and expensive to fix after the tool is cut.

For parts with undercuts, the slide or lifter stroke is a separate requirement that lives in the same envelope. A slide that needs 25 mm of travel needs 25 mm of clearance inside the mold base, and on a small press that clearance can collide with the tie bars during setup. Published component guidance on mold structure is worth reading alongside the machine envelope, and our injection mold components guide covers the slide and lifter side.

Drive Types and What They Change

Published machine references classify presses by clamping method, and the three families behave differently enough to affect what you should expect from a quote.

Hydraulic machines were the only option until the first electric-drive machine was introduced in 1983. They develop clamp force with a hydraulic cylinder, deliver high tonnage in a compact frame, and are tolerant of long holding phases because the pump holds pressure rather than a motor holding position. They are also the noisiest and the least energy-efficient at idle.

Toggle machines build tonnage mechanically through a linkage. The clamp curve is steep near the end of stroke, which is efficient, and the mechanics are simple and maintainable. Toggle presses are the workhorse for small and mid-size parts, and they are the reason a 100-tonne class press is affordable.

Electric-drive machines use servo motors on the injection and clamp axes. Published references describe them as quieter, faster and more precise, and more expensive. The precision is real: repeatability of shot position translates into part-weight repeatability, which is what a tight tolerance actually depends on. For parts with tolerances inside +/-0.03 mm, or for medical and electronic programs where the process must be documented shot by shot, electric drive is usually the right answer and the premium is recovered in yield.

Drive type Strength Weakness Best fit
Hydraulic High tonnage per unit size, tolerant holding Noise, energy at idle, oil maintenance Large parts, long hold, thick walls
Toggle Simple, maintainable, cost-efficient Steep clamp curve, wear on linkages Small and mid-size general parts
Electric drive Repeatable, quiet, clean, fast Higher capital cost Tight tolerance, medical, electronics
Hybrid Compromise on speed and energy More subsystems to maintain Mixed portfolios

If a supplier cannot tell you which drive type their quoted press uses, the quote is not specific enough to compare against another. Press class is part of the price.

Horizontal or Vertical for Your Part

Published classification also separates machines by structure. In a horizontal machine the clamping and injection units sit on one horizontal centreline and the mold opens horizontally. The low profile makes operation and maintenance easy, the low centre of gravity makes installation stable, and gravity assists part drop, which is why horizontal machines dominate automated molding.

Vertical machines place both units on a vertical centreline, so the mold opens upward. Floor space per machine is smaller, insert loading is easier because the operator works at the open lower half, and published references put them at small machines, especially below 60 g of shot. The trade-off is ejection: parts do not fall out on their own, so full automation is harder.

For insert molding, where a metal insert must be placed in the cavity every cycle, the vertical configuration often wins on labour even though the machine itself is slower. For everything else at volume, horizontal is the default and the quote should assume it.

Residence Time Screw Size and Cycle Fit

Residence time is how long a pellet of resin spends in the barrel before it becomes a part. It is a function of barrel capacity, shot size and cycle time. If a press rated at 200 g runs a 134 g shot on a 28 s cycle, the shot uses 67% of capacity, so the material sits for roughly 1.5 cycles, or about 42 s, plus the melt film at the screw surface which is older. That is comfortable for ABS and PP.

Change the part, not the machine. A 40 g shot on the same 200 g barrel uses 20% of capacity, which means the material sits for roughly five cycles, or about 140 s at a 28 s cycle. For POM, PVC or an FR grade, that is long enough to degrade, and degradation shows up as silver streaks, a drop in impact strength and a smell that the operator notices before the quality lab does. The practical target is to keep a shot in the 60-70% band of barrel capacity, which is why a shop with a wide press range can quote a small part at a competitive price and a shop with only large presses cannot.

Screw geometry matters in the same pass. A general-purpose screw with an L/D around 20:1 and a compression ratio near 2.5 handles the majority of commodity resins. Glass-filled grades need a wear-resistant screw and check ring, and the wear is a maintenance cost that eventually shows up in the price of the part. Published material guidance on fillers and abrasion is worth reading before choosing a machine for a GF30 program; our injection molding materials guide covers the filler ladder.

Cycle time is the last fit check. A press with a fast dry cycle but a slow plasticizing rate will hold the cycle at the plasticizing limit, not the cooling limit, and the quoted cycle will be wrong by a few seconds. At 500,000 parts a year, a 2 s error is 278 machine hours. The arithmetic belongs in the quotation.

The Machine Fit Checklist to Send With an RFQ

Send this with your part data and the molder’s quote becomes verifiable instead of plausible. Every line is a number.

Item What to state Why it matters
Resin and grade Base resin, filler percentage, density Shot capacity conversion and screw wear
Part weight Finished weight in grams Shot capacity
Cavitation Number of cavities Shot and clamp force
Runner weight Estimated runner and sprue grams Shot capacity
Projected area cm2 per cavity plus runner Clamp force
Wall thickness Minimum and nominal, mm Required cavity pressure band
Flow length Longest fill path, mm Flow-length-to-thickness ratio
Mold base size Outside dimensions, mm Tie-bar spacing and platen
Mold height Stack height closed, mm Minimum and maximum mold thickness
Required stroke From H1 and H2, mm Opening stroke
Ejection stroke From core height, mm Ejector travel
Tolerance Critical dimensions and grade Drive type and process control

The three checks most often skipped are runner weight, mold height and required stroke. Each one can invalidate a quote on its own, and each takes a minute to supply.

Failure Modes of a Wrong Machine Match

Every failure below is a machine-fit failure, not a process failure, and none of them are fixed by turning knobs.

Symptom Machine-side cause Fix
Short shot at maximum injection pressure Shot capacity too small, screw bottoms out Larger barrel or fewer cavities
Flash at the parting line with clean tooling Clamp force below required tonnage Higher tonnage press
Part weight scatters 2-3% shot to shot Shot above 85% of capacity, unstable cushion Smaller shot or larger barrel
Sink near the gate that will not pack out Hold pressure limited by machine or press too small for hold Verify hold pressure and gate seal
Silver streaks and a burnt smell Residence time too long on an oversized barrel Smaller barrel, lower melt temperature
Mold will not close to tonnage Mold thinner than the machine minimum Spacer plate or different press
Part drags on the core at ejection Ejection stroke short of core height Longer stroke machine
Sprue strings every cycle Nozzle radius smaller than sprue radius Match the SR

The common thread is that each symptom looks like a process problem on the floor and is actually a specification problem in the quote. A trial that fails for these reasons costs a day and a set of samples, and the fix costs a machine change, not a parameter change.

Frequently Asked Questions

How do I calculate the tonnage I need for an injection molded part?

Multiply projected area in cm2 by average cavity pressure in bar and divide by 1,000 to get tonnes. A 200 cm2 tool at 300 bar needs 60 tonnes, and a 15% allowance brings it to about 69 tonnes. Use the upper end of the 20-40 MPa band for thin walls and long flow paths.

What does a 200 gram shot capacity mean for a resin other than polystyrene?

It means the barrel holds 200 g of polystyrene at full stroke. For another resin, multiply by the resin density and divide by 1.05, so PC at 1.20 g/cm3 gives about 228.6 g. Then keep the actual shot within 85% of that, which is 194 g.

Why is 85% the ceiling for shot size?

Because the last portion of barrel capacity is where plasticizing time becomes short relative to the cycle, melt temperature becomes uneven across the shot, and cushion becomes unstable. Part weight scatter is the first symptom, and dimensional scatter follows.

What is the opening stroke rule for a two-plate mold?

The rule is S >= H1 + H2 + 5-10 mm, where H1 is the demolding distance, normally the core height, and H2 is the product height including the gating system. A part 85 mm tall on a 120 mm core needs a stroke of at least 212.5 mm.

How much extra stroke does a three-plate mold need?

It needs the separation distance between the fixed mold half and the gate plate added to the opening stroke, because the tool opens in two stages. A 150 mm runner-plate separation therefore adds roughly 150 mm compared with a two-plate tool for the same part.

Which drive type should I specify for a tight tolerance part?

Electric drive is the usual answer when tolerances are inside +/-0.03 mm or the process must be documented shot by shot, because servo axes repeat shot position more precisely than a hydraulic circuit. The published trade-off is a higher machine price against better yield.

Can a mold that fits a small press be moved to a larger one?

Usually yes on tonnage and often no on stroke and residence time. A larger press often has a larger barrel, which lengthens residence time for a small shot, and its minimum mold thickness may be greater than the tool’s stack height. Both must be checked before the move.

How do I know whether my part needs a vertical machine?

Vertical machines are published as suitable for small shots, especially below 60 g, and they make insert loading easier because the operator works at the open lower half. If your process places a metal insert every cycle, vertical is worth costing; otherwise horizontal is the default.

What is residence time and why does it matter for POM and PVC?

Residence time is how long a pellet stays in the barrel before it is molded, roughly the ratio of barrel capacity to shot size multiplied by cycle time. POM, PVC and many FR grades degrade when that time is long, producing silver streaks and a loss of impact strength.

Does projected area include the runner?

Yes. The runner is pressurized melt pushing the platens apart, so its projected area belongs in the calculation. On a small part with a long runner the runner can account for a third of the total projected area and change the tonnage requirement.

How much clearance do I need between the mold base and the tie bars?

Enough to swing the tool in during setup, which in practice means a few millimetres on each side for a small tool and considerably more for a heavy one. A mold base dimensioned to the tie-bar spacing with zero margin is a mold that cannot be loaded safely.

Can I quote a part without knowing the press?

You can quote a price, but you cannot quote a process. Without a press the cycle time, tonnage, shot capacity and stroke are all assumptions, and each assumption is a change order waiting to happen after the tool is cut.

Sources

Send Your Part Data for a Machine Match

Send the part model, resin grade, cavitation, tolerance and annual volume, and we will return a machine match with tonnage, shot capacity, mold base envelope and cycle estimate on the same sheet. Our engineers quote the tool and the press together so that a specification error cannot appear at trial.

Get a quote or talk to an engineer before the tool drawing is released. If you already have a mold and need the molding side costed, the injection molding service page shows what we need to quote it, and the injection molding cost guide explains how the tool, material and cycle lines are built.

NEXT STEP

Ready to Start Your Project?

Send us your requirements — our team responds within 24 hours. Pricing and a realistic lead time come with the reply.